We are providing our services to KONE Elevators and Escalators & also to Varian Medical Systems. We are having different phase of Installation when we are installing the product.

 

KONE Services

Template Fixing & Pocket Marking.
Rail Hoisting & Alignment.
Machine Room installation & Alignment.
Inside shaft installation & Alignment.
Car installation & alignment.

Varian Services

Chassis Unloading & Installation

Baseframe Unloading:

 

The metal chassis on which the LINAC is installed is called Baseframe.

The Baseframe is sent to the installation site much prior to the actual installation.

The Baseframe is unloaded at the installation site as soon as it is delivered.

 

baseframe unloading picture1 baseframe unloading picture2 baseframe unloading picture3

 

baseframe unloading picture1 baseframe unloading picture2 baseframe unloading picture3

 

baseframe unloading picture1 baseframe unloading picture2 baseframe unloading picture3

 

Baseframe Installation

 

The Baseframe is lowered into the pit.

Make required alignments between Baseframe and the Room.

The pit is filled with concrete.

baseframe unloading picture1 baseframe unloading picture2 baseframe unloading picture3

 

baseframe unloading picture1

 

Close

 

Unloading

Unloading

 

The different parts of LINAC are sent packed inside the wooden boxes.

These wooden boxes are then packed inside the containers (from UK and US) and shipped towards installation site.

These containers are then unloaded at the installation site.

baseframe unloading picture1 baseframe unloading picture2 baseframe unloading picture3

 

baseframe unloading picture1

 

Close

 

Rigging (& Wrapping)

Rigging

 

The different parts of LINAC are then unpacked from their individual boxes.

They are brought inside the installation room.

They are assembled together using required rigging techniques.

baseframe unloading picture1 baseframe unloading picture2 baseframe unloading picture3

 

baseframe unloading picture1

 

Wrapping

Sometimes it is possible that the site is not ready to proceed the installation further.

At such situations, the LINAC must be wrapped to avoid from dust and ongoing construction damages.

baseframe unloading picture1 baseframe unloading picture2 baseframe unloading picture3

 

baseframe unloading picture1 baseframe unloading picture1 baseframe unloading picture2 Close

 

Extended Rigging

Extended Rigging

 

All connections of the LINAC from different parts are then connected at its designated places.

Various Accessories of LINAC used during treatment are installed.

baseframe unloading picture1 baseframe unloading picture2 baseframe unloading picture3

 

baseframe unloading picture1 baseframe unloading picture1 baseframe unloading picture2 Close

 

Handover

Handover

 

The LINAC is then handed over to the VARIAN Installation Engineer, who will continue the installation further.

baseframe unloading picture1 baseframe unloading picture2

 